The first image shows the subsea cable being loaded into
the hold of a cable laying ship in the port of Dremmen, Norway, before
transportation and deployment.
Image Copyright: Mike Brookes Roper FBIPP |
The second image shows the cable going from ship to shore
where it will be connected before being lowered to the seabed and later
attached to a wave or tidal electricity generating device.
Image Copyright: Mike Brookes Roper FBIPP |
No comments:
Post a Comment